home *** CD-ROM | disk | FTP | other *** search
/ Spec Disk 1998 Spring 4.0 / Spec Disk 1998 Spring 4.0.iso / text / 10532eor.txt < prev    next >
Text File  |  1998-06-10  |  15KB  |  397 lines

  1.                          SECTION 10532
  2.  
  3.                      LOUVERED OPENING ROOFS
  4.  
  5. NOTE ** Eclipse Opening Roof; operable aluminum roof
  6.         louvers, with motor and controller.
  7. NOTE **
  8. NOTE ** This section is based on products manufactured and
  9.         distributed by
  10. NOTE **    Eclipse Opening Roof USA
  11. NOTE **    1050 Kansas Avenue, Suite D
  12. NOTE **    Modesto, CA  95351
  13. NOTE **    Tel: (209) 527-4987
  14. NOTE **    Fax: (209) 527-1347
  15.  
  16. NOTE ** The Eclipse Opening Roof System comprises one or
  17.         more banks of slim, interconnected, extruded
  18.         aluminum roof louvers that can be rotated from
  19.         fully closed through approximately 170 degrees to
  20.         any desired position, using an electric motor or
  21.         manual controlling mechanism.
  22. NOTE **
  23. NOTE ** Eclipse Opening Roofs can be incorporated into
  24.         almost any architectural design; level, pitched, or
  25.         vertical.  Components can also be utilized in fixed
  26.         installations for privacy screening or sun shading.
  27. NOTE **
  28. NOTE ** SECTION 10532 - LOUVERED OPENING ROOFS, copyright
  29.         1998, The Architect's Catalog, Inc.
  30.  
  31.  
  32. PART 1  GENERAL
  33. NOTE ** Throughout this section, you may add, delete, or
  34.         edit items as required, except where specific
  35.         alternatives are listed.  Detailed information or
  36.         assistance with your project is available from the
  37.         manufacturer.
  38.  
  39. 1.1 SECTION INCLUDES
  40. NOTE ** Delete items below not needed for project; add
  41.         others as required.
  42.  
  43.     A.  Extruded, prefinished aluminum louvers.
  44.  
  45.     B.  Louver support tracks and pivot pins.
  46.  
  47.     C.  Supporting structure.
  48.  
  49.     D.  Flashings, guttering, and downspouts.
  50.  
  51.     E.  Electric control system and wiring.
  52.  
  53.     F.  Manual control system.
  54.  
  55.     G.  Accessories.
  56.  
  57. 1.2 RELATED SECTIONS
  58. NOTE ** Delete any sections below not relevant to this
  59.         project; add others as required.
  60.  
  61.     A.  Section 03300 - Cast-In-Place Concrete:  Concrete
  62.         structural framework.
  63.  
  64.     B.  Section 05120 - Structural Steel:  Steel structural
  65.         framework.
  66.  
  67.     C.  Section 05140 - Structural Aluminum:  Aluminum structural
  68.         framework.
  69.  
  70.     D.  Section 05500 - Metal Fabrications:  Miscellaneous metal.
  71.  
  72.     E.  Section 06100 - Rough Carpentry:  Wood structural framing
  73.         and decking.
  74.  
  75.     F.  Section 06181 - Glued-Laminated Structural Units:
  76.         Laminated wood structural framework.
  77.  
  78.     G.  Section 07361 - Gutters and Downspouts.
  79.  
  80.     H.  Section 07620 - Sheet Metal Flashing and Trim.
  81.  
  82.     I.  Section 07900 - Joint Sealers.
  83.  
  84.     J.  Division 16 - Electrical:  General requirements for
  85.         electrical installation.
  86. NOTE ** Check relevance of electrical sections to standard
  87.         installation:  12 volt motor, solar recharged
  88.         battery.
  89.  
  90. 1.3 REFERENCES
  91. NOTE ** Add any references that are included in text you
  92.         have added to the section; delete any references
  93.         not required.
  94.  
  95.     A.  AAMA 603.8 - Voluntary Performance Requirements and Test
  96.         Procedures for Pigmented Organic Coatings on Extruded
  97.         Aluminum; American Architectural Manufacturers
  98.         Association.
  99.  
  100.     B.  ASTM D 2247 - Standard Practice for Testing Water
  101.         Resistance of Coatings in 100% Relative Humidity.
  102.  
  103. 1.4 PERFORMANCE REQUIREMENTS
  104.  
  105.     A.  Structural Performance:  Design opening roof assemblies
  106.         to withstand ___ psf (___ kPa) live load, plus weight of
  107.         assembly.
  108.         1.  Maximum allowable deflection:  1/100th of span, after
  109.             installation (wind loading).
  110.         2.  Maximum allowable deflection:  1/40th of span, after
  111.             installation (snow loading).
  112.         3.  Maximum allowable deflection:  1/___th of span, after
  113.             installation.
  114.  
  115.     B.  Finish Performance:  No cracking, blistering, peeling, or
  116.         loss of adhesion after 1,000 hours of testing in
  117.         accordance with ASTM D 2247.
  118.  
  119. 1.5 SUBMITTALS
  120.  
  121.     A.  Submit under provisions of Section 01300.
  122.  
  123.     B.  Product Data:  Manufacturer's product specifications,
  124.         standard details, installation instructions, general
  125.         recommendations, and maintenance requirements as
  126.         applicable to components specified.
  127.  
  128.     C.  Shop Drawings:  Dimensioned drawings showing plans and
  129.         elevations of structure and opening roof panels, sections
  130.         and details, in addition to standard details and wiring
  131.         diagram.
  132.  
  133.     D.  Selection Samples:  Color chips or charts for selection
  134.         from range of standard or custom colors and finishes.
  135.  
  136.     E.  Verification Samples:  Actual section of louver in
  137.         selected finish, not less than 6 inches (150 mm) long.
  138.  
  139.     F.  Related Materials:  Listing of products and materials
  140.         required for complete installation not supplied by
  141.         manufacturer of louvered opening roofs.
  142.  
  143. 1.6 QUALITY ASSURANCE
  144.  
  145.     A.  Manufacturer Qualifications:  Company with not less than
  146.         two years of experience in design and installation of
  147.         extruded aluminum louver opening roof systems similar to
  148.         those required for this project.
  149.  
  150.     B.  Installer Qualifications:  Installer with not less than
  151.         three years of experience in installing similar roofing
  152.         framework, and holding certificate from manufacturer as a
  153.         qualified installer.
  154.  
  155.     C.  Field Measurements:  Where possible, especially with
  156.         existing framework or substrate, take field measurements
  157.         of structural framing and substrate to receive the
  158.         system, prior to manufacture of louvers, gutters, and
  159.         other customized components.
  160.  
  161. 1.7 DELIVERY, STORAGE, AND HANDLING
  162.  
  163.     A.  Delivery:  Deliver all components to the project site
  164.         properly packaged to provide reasonable protection
  165.         against damage to material and finishes from transport or
  166.         adverse weather.
  167.         1.  Inspect packaging upon arrival at site for external
  168.             signs of impact or water damage.
  169.         2.  Photograph damaged packaging prior to opening.
  170.         3.  Open damaged packages for close inspection of
  171.             contents
  172.         4.  Notify manufacturer of any damaged packaging or
  173.             product.
  174.  
  175.     B.  Storage:  Store all material above ground on suitable
  176.         platforms or dunnage.  Elevate one end to allow for
  177.         moisture runoff.  Store under waterproof covering.
  178.         Provide for proper ventilation to avoid build-up of
  179.         condensation.
  180.  
  181.     C.  Handling:  Exercise extreme care in handling, loading and
  182.         unloading, storing and installing components to prevent
  183.         surface damage, bending, and twisting.  Set individual
  184.         louvers in protective racks during preparation work prior
  185.         to installation, to prevent damage.
  186.  
  187. 1.8 WARRANTY
  188.  
  189.     A.  Manufacturer's Limited Warranty:
  190.         1.  Provide manufacturer's written warranty that aluminum
  191.             louvers, tracks, lock angles, and pivot pins will be
  192.             free of defects in materials and workmanship for a
  193.             period of five years after installation.
  194.         2.  Provide manufacturer's written warranty that other
  195.             components  will be free of defects in materials and
  196.             workmanship for a period of one year after
  197.             installation.
  198.         3.  Provide manufacturer's written warranty against
  199.             cracking, blistering, peeling, or loss of adhesion of
  200.             finishes for a period of five years from the date of
  201.             installation.
  202.  
  203.     B.  Installer's Warranty:  Provide installer's written
  204.         warranty against defective installation for a period of
  205.         ____ years after installation.
  206.  
  207. PART 2  PRODUCTS
  208.  
  209. 2.1 MANUFACTURERS
  210.  
  211.     A.  Acceptable Manufacturer:  Eclipse Opening Roof USA; 1050
  212.         Kansas Avenue, Suite D; Modesto, California  95351.  ASD.
  213.         Tel: (209) 527-4987;  Fax: (209) 527-1347.
  214. NOTE ** Delete one of the two paragraphs below; coordinate
  215.         with Division 1 requirements.
  216.  
  217.     B.  Requests for substitutions will be considered in
  218.         accordance with provisions of Section 01600.
  219.  
  220.     C.  Substitutions:  Not permitted.
  221.  
  222. 2.2 SYSTEM
  223.  
  224.     A.  Louvered opening roof system made to order and comprised
  225.         of the following components:
  226.         1.  Extruded aluminum louvers.
  227. NOTE ** Delete items from the list below not required for
  228.         the project;  add others as required.
  229.         2.  Pivot pins and support tracks;  louver
  230.             interconnecting links.
  231.         3.  Structural framework.
  232.         4.  Custom guttering and downspouts.
  233.         5.  Sheet metal flashing and trim.
  234.         6.  Customized insect screening.
  235.         7.  Customized electronic motor control system.
  236. NOTE ** Delete two of the following three items.
  237.         8.  12 volt geared electric motor, with 12 volt solar
  238.             rechargeable battery power supply, wiring, and
  239.             switching.
  240.         9.  12 volt geared electric motor, 110 volt AC/12 volt DC
  241.             power supply, wiring, and switching.
  242.         10. Manual louver control mechanism.
  243.  
  244. 2.3 ALUMINUM COMPONENTS
  245.  
  246.     A.  Louvers:  Solid extruded aluminum, nominal thickness 0.07
  247.         inches (1.78 mm), cover 5-7/16 inches (138 mm), width 6-
  248.         1/2 inches (165 mm), incorporating 2-1/2 sq in (1613 sq
  249.         mm) water drainage channel in each louver.
  250. NOTE ** Maximum unsupported span of louver blades is 12
  251.         feet (3600 mm), subject to live loading design
  252.         conditions.
  253. NOTE **
  254. NOTE ** Select one of the following length options and
  255.         delete the others.  Standard louver lengths are 7
  256.         feet, 8 feet, 9 feet, 10 feet, 11 feet, and 12
  257.         feet.  Louvers can be cut to exact length required.
  258.         Add 3-1/4 inch (83 mm) to louver length for
  259.         required opening in finished structure, between
  260.         gutter support substrates.
  261.          1. Length:  As indicated on drawings.
  262.         2.  Length:  As scheduled.
  263.         3.  Length:  ____________.
  264.  
  265.     B.  Gutters and Downspouts:  Sheet aluminum formed to
  266.         manufacturer's standard profiles.
  267. NOTE ** Select desired finish from options below; delete
  268.         those not required.
  269.  
  270.     C.  Standard Finish:  Provide manufacturer's standard
  271.         thermosetting polyester coating for aluminum components,
  272.         complying with AAMA 603.8, and as follows:
  273.         1.  Color:  As selected from manufacturer's standard
  274.             color range.
  275.         2.  Color:  Custom color, as scheduled.
  276.         3.  Color:  ____________.
  277.  
  278.     D.  Non-Standard Finish:  Baked on powder coating, with color
  279.         as scheduled.
  280.  
  281.     E.  Non-Standard Finish:  PVDF finish, with color as
  282.         scheduled.
  283.  
  284.     F.  Non-Standard Finish:  ____________________.
  285.  
  286. 2.4 STRUCTURAL FRAMING
  287.  
  288.     A.  Provide structural support for louvered opening roof as
  289.         detailed, and as follows:
  290.         1.  Aluminum framing system, as specified in Section
  291.             05140.
  292.         2.  Wood framing as specified in Section 06100.
  293.         3.  Steel framing as specified in Section 05120.
  294.         4.  Laminated timber framing, as specified in Section
  295.             06181.
  296.         5.  Concrete structure, as specified in Section 03300.
  297.  
  298.     B.  Coordination:  Provide coordination as required for
  299.         proper installation of louvered opening roofs in
  300.         structural support.
  301. NOTE ** Delete the following article if manual control
  302.         mechanism is specified;  if electric system is
  303.         specified, delete options not required.
  304.  
  305. 2.5 ELECTRICAL COMPONENTS
  306.  
  307.     A.  Manufacturer's standard 12 volt electric motors, with
  308.         maximum of 200 sq ft (18.4 sq m) of louvers per motor,
  309.         subject to manufacturer's design confirmation.
  310.  
  311.     B.  Controller:  Manufacturer's standard toggle switch.
  312.  
  313.     C.  Controller:  Customized electronic motor control system.
  314.  
  315.     D.  Battery:  12 volt DC rechargeable battery with solar
  316.         panel.
  317.  
  318.     E.  Battery:  12 volt DC rechargeable battery with 110 volt
  319.         AC/12 volt DC battery charger.
  320.  
  321. 2.6 ACCESSORIES
  322.  
  323.     A.  Fasteners, sealants, and miscellaneous components as
  324.         recommended by manufacturer.
  325.  
  326.  
  327. PART 3  EXECUTION
  328.  
  329. 3.1 EXAMINATION
  330.  
  331.     A.  Verify that installation areas conform with dimensions
  332.         and tolerances shown on approved shop drawings.
  333.  
  334.     B.  Examine area of installation to verify that substrates
  335.         are ready to receive installation of opening roof
  336.         components.
  337.  
  338.     C.  Verify locations for gutter downspouts.
  339.  
  340.     D.  Verify that appropriate power source is available for
  341.         electric motor.
  342.  
  343.     E.  Do not proceed with installation until unsatisfactory
  344.         conditions have been corrected.
  345.  
  346. 3.2 INSTALLATION
  347.  
  348.     A.  Install components to be plumb, level, and straight, and
  349.         make all connections rigid and secure, in conformance
  350.         with the design indicated.
  351.  
  352.     B.  Install custom guttering to be rigid, secure, and free
  353.         from leaks, providing proper and adequate drainage.
  354.  
  355.     C.  Install extruded aluminum louvers and associated
  356.         components so they are parallel and secure and operate
  357.         correctly and freely, providing adequate fall for louver
  358.         drainage, in compliance with manufacturer's instructions.
  359.  
  360.     D.  Install electrical components and make electrical
  361.         connections in conformance with governing codes and
  362.         manufacturer's instructions.
  363.  
  364. 3.3 ADJUSTING AND CLEANING
  365.  
  366.     A.  Verify that all movable components are operating properly
  367.         and that installation is complete.  Make any adjustments
  368.         needed to bring installation into conformance with
  369.         manufacturer's specifications.
  370.  
  371.     B.  Remove excess materials and debris caused by work of this
  372.         section from the project site.
  373.  
  374.     C.  Clean structure, gutters, louvers, and other components
  375.         in accordance with manufacturer's recommendations.
  376.  
  377.     D.  Touch up minor scratches and abrasions with paint
  378.         provided or approved by manufacturer or material
  379.         finisher.
  380.  
  381.     E.  Protect finished work against damage.  Replace any work
  382.         that becomes damaged prior to final inspection and
  383.         acceptance.
  384. NOTE ** DISCLAIMER:  The information presented in this
  385.         document is for illustrative purposes only.
  386.         Eclipse Opening Roof USA assumes no responsibility
  387.         for its use.  Anyone relying upon or making use of
  388.         this information does so at his own risk and
  389.         assumes any and all liability or other consequences
  390.         resulting therefrom.
  391. NOTE **
  392. NOTE ** Check www.arcat.com for latest specification
  393.         update.
  394.  
  395.  
  396.                          END OF SECTION
  397.